- COSSACK towed stern first by two tugs to Prince of Wales
Dock, Robbs’s Shipyard, Leith arriving at 1145. Shell room and magazine emptied Period in dock 8/11 – 9/1/40. Turbine repairs were also undertaken at this time. (Separate detailed report available in the archives)