Refit at Thorneycroft’s Yard, Southampton.
Repairs included docking for structural work on external bottom plating to rectify corrugation caused by high speed in poor weather and modification of accommodation for the increased complement to 226.
Type 286 RADAR modified to allow use of a rotating aerial unit. (286M)
After funnel was shortened and the Mainmast reduced in size.