Wind south easterly force 1 to 4. Barometer rising to 30.32 inches.
0700. Gave general leave to port watch.. Caulkers from shore caulking outside of ship. Watch employed fitting upper yards., painting masts and yards. Sailmakers repairing Mainsail. Found main top gallant mast had sprung. It was surveyed and condemned..
PM. Employed as in the forenoon. Mustered at Quarters. Port watch returned form leave.