At single anchor in Port Malinda. Position at noon. 3.39S 59.58E. Wind SSE force 2 with broken cloud and lightning. Barometer 29.74 inches rising to 29.78 at noon before falling to 29.74 at midnight. Temperature at noon 78F. 0615. Weighed and proceeded out of harbour. 0630. 70 revolutions. 0710. Vasco da Gama Pillar W by N 3 ½ miles (Picture below.)
Shaped course to S by W at 6 knots. Wind south force 2. 0830. Altered course to SW ½ S. 1000 altered course to SW ½ W at 3.8 knots. Employed cleaning ship throughout. 1115. Stopped and examined dhow then proceeded. 1145 Altered course to SSW. 1200. Eased to 32 revolutions – 1.8 knots. Wind SE force 3 to 4. Gloomy dark weather with rain and lightning. 1300 increased to 70 revolutions – 7 knots. Course as requisite to close dhow. 1350 Stopped and examined dhow. 1400 proceeded SSW at 40 revolutions – 4 knots. Employed as requisite. 1600 Altered course to NE by E. Increased to 45 revolutions – 4.8 knots. Wind SW force 3 with continuous rain.1715 Mustered Quarters. 2000. Altered course to NE at 4.5 knots. Wind south with passing showers. Coal expended 13 tons. Number on sick list 9.
